Stella 53
A compact A-frame cabin for guest accommodation, private use and repeat-unit projects.
Factory-cut timber cabin kits prepared in Turkey, shipped internationally, and assembled by local crews.
Start with four of our most requested models, from compact A-frames to larger multi-bedroom cabin kits.
A compact A-frame cabin for guest accommodation, private use and repeat-unit projects.
A roomier A-frame layout suited to rental cabins, resorts and larger guest accommodation.
A larger non-A-frame cabin with two-bedroom potential and an efficient multi-unit shipping format.
A larger cabin platform for buyers who need more interior space and two- or three-bedroom planning.
SolidCabin kits are designed as a broader structural and exterior package, with factory-prepared components and model-specific documentation for local assembly.
Structural timber, wall and roof components, exterior materials, joinery and model-specific details are coordinated as one cabin-kit package.
See the kit scope →Factory-cut and labeled components reduce measuring, sorting and material coordination for the local crew.
See packing and delivery →Kit details continue to improve through completed projects, installer feedback and repeat-unit experience.
View completed projects →The exact package varies by model and quotation, but the project is normally divided into a standard kit, selected options and locally completed work.
A cabin-kit quotation is only one part of the project. Review cost, scope, shipping and permit responsibilities before selecting the final package.
Separate the cabin-kit price from freight, import costs, site work, utilities, local labor and final completion.
Compare the standard manufacturer package, selected add-ons and work that is normally completed locally.
Plan container loading, ocean freight, customs, unloading, inland delivery and site-access requirements.
Understand the difference between manufacturer drawings, site-specific engineering and locally stamped permit plans.
Four completed U.S. references across different cabin models, project sizes and local assembly conditions.
Montana
A completed Stella 53 reference showing a compact A-frame cabin kit in a hospitality setting.
View Project →
West Virginia
A multi-unit Stella 70 project demonstrating repeat assembly across a larger cabin development.
View Project →
Arkansas
A completed Aries 96 project showing the model's modern form and two-level interior layout.
View Project →
Idaho
An Aries 116 reference with a larger footprint for projects requiring more interior space.
View Project →Long-form assembly footage is prioritized on larger screens, while mobile visitors can move quickly through selected project Shorts.
A U.S. crew assembles the Stella 53 from labeled kit components, showing the sequence from structural frame to completed cabin.
Watch on YouTube →
Three Stella 70 units are assembled for a West Virginia cabin project, documenting repeat-unit construction from frames to enclosed cabins.
Watch on YouTube →
A start-to-finish Aries 96 build showing the modern cabin structure, exterior package and local on-site assembly sequence.
Watch on YouTube →
A quick project view of the larger Aries 116 cabin kit during on-site assembly in Idaho.
Watch on YouTube →
A quick view of the Stella 53 assembly and completed cabin.
Watch Short on YouTube →
A condensed look at the repeat assembly of multiple Stella 70 units.
Watch Short on YouTube →
A short start-to-finish view of the Aries 96 cabin build.
Watch Short on YouTube →
A vertical project view of the larger Aries 116 cabin kit.
Watch Short on YouTube →Explore additional assembly footage, completed cabin tours and factory content on our YouTube page.
Choose your model and scope. We prepare the kit, pack it for shipment, and provide drawings and assembly logic for your local crew.
Select the model, layout, options, quantity and destination.
We confirm the selected scope, preliminary shipping plan and required project documents.
The kit is factory-cut, labeled and packed. Typical manufacturing time is approximately 8–10 weeks.
The kit is shipped through the agreed route and assembled by the customer’s local team using the supplied documentation.